Instruments Mobilization & Setup – Day 1

Today we mobilized and set up the CSEM and multi-beam systems onboard the Huki Pono survey boat. We tested the two CSEM transmitters (Main unit: 150 Amp output current; Spare unit: 50 Amp output current) with a dummy-load, and they both operate as expected. The multi-beam head was adjusted to the ideal depth of transmission and tested successfully. After all, we had a pretty good first day, as team members worked together to prepare the boat for the survey. Thank guys for all of your hard work!

GPS_Porpoise
Dallas is preparing and marking the Porpoise’s GPS units.
Transmitter
Eric performs a test to the CSEM transmitter B150.
GPS
Jake prepares the Zephyr GPS station for time sync and the setup of the electromagnetic and navigation data loggers.

Tomorrow we have another mobilization day and instrument testing before the survey starts on Friday, September 7th.

Advertisement

One Reply to “Instruments Mobilization & Setup – Day 1”

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: